Benchmark 5000-6000 Boiler Installation & Startup Manual
SECTION 6:
BOILER SEQUENCING TECHNOLOGY
OMM-0123_E
• GF-207 • 12/17/2019 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
88
of
95
OPTION 6 - Remote Setpoint With Direct Wired Header Sensor And Modbus
Setpoint Drive Instructions
NOTES:
•
Polarity must be observed for the RS485 connections. The ground for the shield is at
the “SHLD” terminal in the I/O the Box.
•
When mounting the Outdoor sensor, it must be located on the North side of the building
where an average outside air temperature is expected. The sensor must be shielded
from direct sunlight as well as impingement by the elements. The outdoor sensor may
be wired up to 200 feet (61m) from the boiler.
•
There is no polarity to be observed. The ground for the shield is at the power supply
ground. The sensor end of the shield must be left free and ungrounded.
Step 3 - Configure ALL C-More Units
On ALL Boilers:
1. Go to the
Configuration
menu and set the BST Menu item to
Enabled
.
2. Go to the Boiler Sequencing Menu and set the BST Mode item to
BST Client
(for now).
On MANAGER only
:
3. Go to the BST Setpoint item and enter the Failsafe Setpoint.
4. Go to the BST Setup Menu item and set to
Enabled
.
5. Go to the BST Setpoint Mode item and select Outdoor Reset.
6. Go to the Head Temp Source item and select
Network
.
7. Go to the Header Temp Addr item and enter the Modbus Address (240).
8. Go to the Header Temp Point item and enter the Modbus Point (14).
9. Go to the BST Outdoor Sens item and select
Enabled
.
10. Go to the Outdoor Temp Source item and select
Network
.
11. Go to the Outdoor Temp Addr item and enter the Modbus Address (240).
12. Go to the Outdoor Temp Point item and enter the Modbus Point (15).
When ALL C-More units have been configured:
13. Go to the Boiler Sequencing Menu item of the Manager unit and set the BST Mode item to
BST MANAGER
.
TEMP SENSOR P/N
61043
MODBUS TRANSMITTER
I/O BOX