After assembling the electrical circuit, turn on the
battery protection switch
[20]
, and press the button
[12]
on each block starting from the master.
• Make sure that
all power cables
are connected
correctly.
•
After the first
power-up, wait until
the energy units are
fully charged
[13]
and only then use
the connected load
(devices).
• Do not use frame
outlets on the block
[2]
.
Connect a load that does not exceed 1500 W for 230
V and 1000 W for 120 V per WATTS, in case of battery
operation (bypass) - no more than 7000 W per block
• In the event of an
overload, WATTS
will be disabled in
an emergency.
Connection and operation
OWNER’S MANUAL - WATTS
STEP 9
Installing a stack (multiple WATTS)
STEP 10
12
20
23
Summary of Contents for WBX 1
Page 1: ...OWNER S MANUAL WATTS WBX 1 ...
Page 2: ......
Page 35: ......
Page 36: ...WATTS OWNER S MANUAL www wattsbattery com manual manual wattsbattery com ...