12
Start-up check list
•
Check that the leak detect sensor is clean and free from process fluid.
•
ReNu 30—For food and beverage applications requiring FDA or EC1935 certification
replace the existing FKM (Viton
®
) O ring seals (2 off) with the EPDM O ring seals
supplied.
•
Fit the pumphead to the drive.
•
Ensure the pumphead ports are securely fitted to the interface tubing.
•
Ensure proper connection has been made to a suitable power supply.
•
Ensure that the general recommendations are followed.
•
When using a ReNu 20 PU pumphead
, ensure you select the 'PU' tube to apply
the correct calibration values.
m-qdos-allmodels-en-07
37