12
Start-up check list
Note
: See also
"Tube replacement " on page 126
o
Ensure that proper connections are achieved between the pump and suction and discharge piping.
o
Ensure proper connection has been made to a suitable power supply.
o
Ensure that the recommendations in the section
"Good pump installation practice " on page 15
are followed.