©
“WATEX” Ltd., Reg. Nr. 40003712811, Ganibu dambis 27 k-5, Riga, LV-1005; Contact information: tel. +371 67381989, e-mail:
[email protected], www.watex.eu
10
The connection to the drain is done as follows:
1. Pull out the red clamp and remove the drain
connection elbow.
2. Pull the garden hose through the nut.
3. Insert the cylindrical insert at the end of the hose.
4. Insert the end of the hose into the drain elbow and
tighten with a nut. Tighten by hand.
5. Put the drain elbow into its port and put the clamp
in its position.
Note:
As the drain connection elbow has a sealing
ring, it can be turned in the direction you want. The
turning angle is 270 degrees.
6. Connect the other end of the garden hose to the
common opening of the drainage system and install a
syphon so that odour from the drain does not enter
the filter.
Important:
Make sure that the garden hose does not
fall out during rinsing. Secure it!
Important:
Make sure that the garden hose does not twist, as this will reduce the flow of rinsing
water and may cause the unit to rinse incompletely, which can lead to poor water quality. The sewer
hose can also be connected to the sewer system above the control unit (max. 1 m), but then the first
rinsing must be followed or a full rinsing of the unit takes place.
If full rinsing does not take place, consult the employees of SIA "WATEX".
Important:
The drainage pipe must not be smaller than D40.
3.4. Connecting the brine tank
The kit includes a reagent tank as well as a 3/8’’ connection pipe. The flexible plastic tube is placed
in the brine tank under the lid. The brine tank should be placed next to the filter column. Can be
placed on either side of the filter column.
The brine tank has a float valve that is placed in the plastic cylinder of the reagent tank. Remove the
float and remove the transport rubber from the bottom of the float. No packing material is required
on the threads.
Remember!
The brine tank will need to be refilled with reagent on a regular basis, so it is recommended that it
be located where it is easily accessible. The illustration shows the control unit, highlighting the
connection point for the reagent supply line. The pipeline is connected as follows