
11
10
2. PRE-INSTALLATION CHECKLIST
Read the manual thoroughly.
We provide you with a comprehensive manual, including points that do not only concern the
WaterWorld Inboard motor but also the entire boat, the propeller, and the batteries. However,
each installation is unique and should be carried out by a qualified professional.
Check if you have received everything included in the delivery.
Arrange everything neatly and compare it with the list in Chapter 4 of this manual and your packing
slip. If you have any questions, contact your supplier immediately.
Prepare the boat for installing the system in a clean and dry environment.
If the following points are not in order, something must be done before installation.
• No permanent bilge water where the motor is installed.
•
Good protection against the boat flooding, such as a well-functioning bilge pump in the
right place in the boat.
• When placing the components, also consider leakage or condensation moisture from
above. A component may need to be placed elsewhere or covered from above for this
reason.
• Ensure good ventilation in the relevant space or spaces so that moisture can evaporate
and leave the area. “Airflow” is crucial here.
•
WaterWorld has developed a very efficient motor that requires sufficient air cooling. It is
essential, however, that enough cold air can enter, and warm air can be expelled.
• A smoothly running and well-aligned propeller shaft system. A heavy-running propeller
shaft system will cause the following problems:
• Higher consumption, resulting in less sailing time
• Engine overheating
• Slower response when accelerating
• Less controlled acceleration, the motor will start with too much power once it has
enough force
Make the right propeller choice.
Refer to our advice on page 44.
Check the accessibility of the components.
Ensure that all components remain accessible for service.
Ensure proper weight distribution in the boat.
The (lead-)battery pack is heavy; ensure proper weight distribution in the boat. Make sure the
batteries are accessible for service to the battery terminals, wiring, and in the case of wet batteries,
filling with distilled water.
Choose the correct cable thickness.
Refer to page 27 for the correct cable choice. Ensure that cable lengths are not unnecessarily long
where possible. For the equal discharge of potentially multiple batteries, it is important that the
lengths of the cables from the main positive pole and the main negative pole are the same.
Read the safety instructions in Chapter 3 before connecting anything.
Then read the part of the manual about the respective component. Always connect according to
the wiring diagram on page 23.
Start the installation.
1.
2.
3.
4.
5.
6.
7.
8.
9.
Step-by-step guide for installation
Installation step-by-step guide
10