
2-24
Setting up the APGC
Installing the LC source enclosure on the instrument
Required materials
Chemical-resistant, powder-free gloves
To install the LC source enclosure on the instrument:
1. Using two hands, fit the source enclosure to the two supporting studs on
the source adaptor housing.
2. Swing the source enclosure closed.
3. Slide open the instrument’s source interface door.
4. Connect the source enclosure cables to the instrument’s connectors.
Tip:
The cables and connectors are color-coded; the blue-sleeved cable
connects to the blue connector and the yellow-sleeved cable to the yellow
connector.
5. Slide the instrument’s source interface door closed.
Warning:
To avoid personal contamination with biologically
hazardous, toxic, or corrosive materials, and to avoid
spreading contamination to uncontaminated surfaces, wear
clean, chemical-resistant, powder-free gloves when handling
source components.
Caution:
To avoid damaging the sample inlet when installing a
NanoLockSpray source enclosure, slide the sprayer platform out of
the source enclosure before closing it.
Summary of Contents for APGC
Page 12: ...xii Table of Contents...
Page 24: ...1 12 Instrument Description...
Page 56: ...3 8 Maintenance Procedures...
Page 72: ...B 4 Installing the GC Column...
Page 76: ...C 4 Preparing Sample Vials...