
Preparing the mass spectrometer for operation with the APGC
2-13
Installing the APGC vial carriers in the mass spectrometer’s
source
Required materials
Chemical-resistant, powder-free gloves
To install the vial carriers in the mass spectrometer’s source
:
1. Fit the heated vial carrier on top of the mass spectrometer’s source ion
block.
2. Fit the unheated vial carrier into the bottom of the APGC source
enclosure; push it fully to the front of the enclosure.
3. Open the source isolation valve.
4. Swing the source enclosure closed.
Vial carrier locations:
Warning:
To avoid personal contamination with biologically
hazardous, toxic, or corrosive materials, and to avoid
spreading contamination to uncontaminated surfaces, wear
clean, chemical-resistant, powder-free gloves when handling
source components.
Warning:
To avoid burn injuries, take great care while
working with the source components, which can be hot.
Heated vial carrier
Unheated vial carrier
Source isolation
valve
Summary of Contents for APGC
Page 12: ...xii Table of Contents...
Page 24: ...1 12 Instrument Description...
Page 56: ...3 8 Maintenance Procedures...
Page 72: ...B 4 Installing the GC Column...
Page 76: ...C 4 Preparing Sample Vials...