
Preparing the mass spectrometer for operation with the APGC
2-3
Removing the LC source enclosure from the mass spectrometer
You must remove the currently fitted source enclosure from the mass
spectrometer before installing the APGC source enclosure.
Required materials
•
Chemical-resistant, powder-free gloves
•
Needle-nose pliers
To remove the source enclosure:
1. Prepare the instrument for working on its source (see
).
2. Slide the instrument’s source interface door open.
3. Disconnect the probe adjuster and options cables from the instrument’s
connectors.
4. Slide the instrument’s source interface door closed.
Warning:
To avoid personal contamination with biologically
hazardous, toxic, or corrosive materials, and to avoid spreading
contamination to uncontaminated surfaces, wear clean,
chemical-resistant, powder-free gloves when working with the
probe and the source components.
Warning:
To avoid electric shock, prepare the instrument for work
) before removing the source
enclosure.
Warning:
To avoid burn injuries, take great care while working
with the source components, which can be hot.
Warning:
To avoid puncture wounds, take great care when
removing an ESI probe; the probe tip is sharp.
Warning:
To avoid puncture wounds, take great care when the
corona pin is in place and you are working with the source
enclosure open. The tip of the corona pin is sharp.
Summary of Contents for APGC
Page 12: ...xii Table of Contents...
Page 24: ...1 12 Instrument Description...
Page 56: ...3 8 Maintenance Procedures...
Page 72: ...B 4 Installing the GC Column...
Page 76: ...C 4 Preparing Sample Vials...