ST E P 4
Locate the USB power cable attached to the inside edge of the forward riser and
carefully install it into the left USB port of the power bank (as seen from in front
of the rower).
1 7.
1 8 .
ST E P 6
Locate the USB power cable hanging from the tablet arm and carefully install it
into the right USB port of the power bank (as seen from in front of the rower).
ST E P 5
Remove the preassembled tablet arm (P) from its box.
With the tablet holder
laying flat / facing up and external tablet arm power cable on the right hand
side (as seen from in front of the rower)
, lay the tablet arm on the top deck cover.
Align the inner surface of holes in the moldings at the bottom of the tablet arm
with the outward-facing surface of the tablet arm brackets.
Using the provided pair of 5mm Allen keys (T) and JCN/JCB hardware (U), attach
the tablet arm to the tablet arm brackets.
T
U
F I L L I N G T H E TA N K
WAT E R L E V E L
The Water Level Gauge is positioned on the side of the tank. The maximum level
to fill the tank is Level 19. DO NOT fill above the maximum level - this could void
the warranty. The standard Calibration Level is
Level 17.
ST E P 1
Remove the rubber access door from the top cover.