7 Installation/ Start-up
ATTENTION: Before start-up
screw it to the swivel door!
•
Thermal protection cover
•
Spacer sleeve, 4 pieces
•
Screw, 4 pieces
RISK OF SCALDING!
Before
commissioning, please install the following connections:
Install the pressure hose included in the scope of supply and provide for an
appropriate outlet.
It is advisable to
install the unit firmly on the drainage system
,
since
very hot water
can drain off from it. This also simplifies the process of
complete emptying, e.g. for cleaning.
After setting the workpiece, fill the unit with tap water, at most up to the engraving in the
tank
(not with dry compression)
. Establish a
pneumatic connection of minimum 2
bar
. If the pneumatic pipe is long, pay attention to the hose cross-section (internal
diameter min. 6 mm). Every pneumatic pipe must always have a maintenance unit. Ensure
a constant pressure by using the pressure reducer.
Finally
, insert the plug into the socket – make sure that the voltage specification of the unit
and the mains network is identical.
Never
operate the unit
without water and over 80 °C (display value)
, since the
heating unit immediately heats up to 60°C or to the preheating temperature
(please check the preheating temperature) when the power switch is activated.
If required, the heating unit can be switched off via the display.
8