Installation Guide
Preparation for water supply and test for operation.
1. Insert the electric plug into the designated socket/fused spur as
recommended by a qualified electrician.
2. When switched on
–
all lights on the unit will be illuminated. The Washloo
will now prime the water system for around 10 seconds and finally the
nozzle will extend out whilst performing a cleaning/first use test function.
3. After the first use test cycle
–
all lights will now turn off and a buzzer sound
will notify the user that the full cycle is now complete.
4.
Now press the ‘Power On’ button on the toilet and/or remote control to set
the toilet to the ‘Standby’ setting.
5. Please note
–
Set the water temperature, water pressure and seat
temperature accordingly before use (We recommend you to set to a low
temperature/pressure for first use to avoid sensitivity until you are familiar
with the Washloo seat).
6. Please follow all instructions within this manual when operating all of the
additional functions.
8
Summary of Contents for Side Control
Page 1: ...Side Control User Manual Clean Comfort Hygiene...
Page 2: ......
Page 20: ......
Page 21: ...Modern Life Smart Choice...