8
Installation
5
6
7
0274
0950
1133
Mechanical installation
• Place wide steel shims on the concrete foun-
dation over the bolts.
• Lift the machine and lower it in position. Never
use the door or the door handle to lift or lower
the machine.
• Check that the machine is level front-to-rear
and side-to-side and standing firmly on the
four (W75, W105) or six (W125 W185) sup-
porting points. Spacing washers must be
mounted if one or more of these points is not
resting against the floor/foundation.
• Place flat washers over the foundation bolts
and secure the machine in position by tighte-
ning the self-locking nuts. See illustration
below.
• Check and tighten the nuts every week for the
first month to compensate for any setting of
the foundation.
selflocking
nut
flat washer
Fig.
5
Fig.
7
Fig.
6
Summary of Contents for Giant W 185
Page 2: ......
Page 6: ......
Page 38: ...31 40 Mechanical and electrical design 1700 W125 208 240 V 60 Hz single phase ...
Page 39: ...32 40 Mechanical and electrical design 1791 ...