8 GUARANTEE REGISTRATION
To qualify for the product guarantee the equipment
MUST
be correctly commissioned and
the below
guarantee registration completed and returned
as instructed overleaf.
Failure to commission and register the product may invalidate ALL guarantees.
Installation Checklist
Tick or insert value
1
Collectors installed as instructed on a suitably strong section of roof?
(tick)
2
Collectors earthed / lightening-protected as instructed?
(tick)
3
Roof made weather-tight at mounting brackets and pipework / cable entries?
(tick)
4
Solder ring fittings and low temperature soldered joints NOT used?
(tick)
5
All pipework insulated with high temperature insulation?
(tick)
6
Cylinder controls fitted as instructed (e.g. motorised valves on unvented cylinders)
(tick)
7
Temperature sensors located, secured and wired as instructed?
(tick)
8
Pump station relief valve outlet plumbed to safe visible discharge?
(tick)
Commissioning
9
Expansion vessel bladder pressure checked (prior to system filling)?
(tick)
Bladder pressure
bar
10 System flushed then filled with Warmflow Solar Fluid
(tick)
11 System flushed of all air (filling station run for at least 45 minutes)
(tick)
12 System pressure tested and inspected for leaks at
all
joints and valve glands
(tick)
13 System pressure set?
(tick)
System pressure (cold)
bar
Control systems
14 Temperature sensor measurements verified?
(tick)
15 Circuit flow commissioning correctly completed?
(tick)
Pump speed setting
Flow rate
l/min
16 Boiler back-up controlled via solar system controller?
Handover
17 Basic function and operation of the system explained?
(tick)
18 Importance of checking system pressure explained?
(tick)
19 Need for annual servicing explained?
(tick)
20 All product literature left with the end user?
(tick)
System details
Collector type
Flat Panel
(tick)
Vacuum Tube
(tick)
System size
Total number of flat panels or vacuum tubes
Pump station serial number (format SDPS1-
xxxx
-
xxx
-
xxx
)
Installation address details
Name
Address
Telephone
Commissioning engineer’s details
Name
Date of Commissioning
Address
Telephone
Signature