890464_k•en•2019-10-01
We reserve the right to carry out improvements
4
Connection
4
3
2
1
Fig. 7 Connecting the weather station
1 Cable conduit
2 Strain relief
3 Aubber seal
4 Terminals
The weather station is supplied with mains voltage.
An on-site overload current disconnecting and isolating
switch to switch off the entire system must be provided.
Route the line in such a way that water cannot flow into
the device.
Use a line that is approved for the operating voltage
and is resistant to weather and UV radiation (suitable
for outdoor use).
If the line immediately enters the device after it emerg-
es from the wall through the cable conduit (
1
), you can
use an NYM 3x1.5 mm
2
.
Pass the line through the cable conduit (
1
) and rubber
seal (
3
) into the housing. Secure the line with the strain
relief (
2
).
Connect the wires to the terminals (
4
). Note the labels
on the terminals.
ITNCE
R
You can also route a surface-mounted line
directly from below into the housing. To
do this, introduce a hole into the cover of
the mounting plate. The inside of the cover
is thinner at the location designed for this
purpose.
Iperating elements
6
7
9
8
10
Fig. 8 Operating elements, view from below, factory setting
6
Wind:
Wind speed limits can be preselected using
this switch.
7
LED:
Flashes green when the L button is
pressed. Flashes red (three at a time) while a wind
alarm is active. Flashes red (three at a time) while a
wind alarm is active. Lights up green when the precipi-
tation monitor is switched on.
8
Brightness:
Brightness limit values can be prese-
lected using this switch.
9
Learn button:
For learning the weather station into
a receiver. This button must be held down until the sun
shading system waves once. If the button is held down
until the sun shading product stops moving, the wind
and brightness evaluation is learned into the receiver
as well.
10
Precipitation button:
To switch precipitation
monitoring on and off, press the button. The status
LED lights up green permanently when precipitation
monitoring is switched on.
Commissioning
You can find instruction videos on our
YouTube channel
at:
http://www.youtube.com/user/SonnenLichtManager/videos
Remove the transparent protective cap from the current
sensor.
Switch the mains voltage on.
The device is now switched on and ready for operation.