background image

Pre drill 

hole

30mm 

screw

13

5

5

Pre drill 

hole

30mm 

screw

Pre drill 

hole

50mm 

screw

a

b

a

b

b

b

b

3

2

b

Pre drill 

hole

50mm 

screw

P 3

Please retain product label and instructions for future reference

             

10

10

Step 2

Attach the door strips to the top of 

the door frames using 3x30mm

screws per strip.

6x30mm Screws

Step 3

Locate each door into the door gap

and fix into place with 2x butt

hinges per door (

ensuring to screw

into the framing

) securing using

6x30mm screws per hinge.

24x30mm Screws

4

4

Step 4

Lay both floor sections (

side by

side & upside down

) on to a firm 

and level surface.

Secure the floor together using

4x50mm screws, fixing in an 

alternating pattern as shown in

the illustration.

Once the floors are attached turn

the floor section the right way up.

4x50mm Screws

Step 5

Place the plain gable and first plain side

onto the asembled floor (

ensuring the 

plain side sits against the overhanging 

boards

).

 

Secure the panels together at the 

 

corner using 3x50mm screws.

 Do 

NOT

 secure to the floor until

 

the roof has been fixed into 

 position.

3x50mm Screws

a

a

b

b

b

b

b

Pre drill 

hole

50mm 

screw

Step 6

Place the assembled door gable and 

second plain side onto the floor section

(

ensuring the plain side sits against the 

overhanging boards

).

 

Secure the panels together at the 

 

corner using 9x50mm screws.

 Do 

NOT

 secure to the floor until

 

the roof has been fixed into 

 position.

9x50mm Screws

a

a

a

1

2

a

a

a

a

a

a

Reviews: