Pre drill
hole
20mm
screw
30mm
screw
Pre drill
hole
30mm
screw
8
6
a
b
a
Pre drill
hole
50mm
screw
HANDLE
WITH CARE
1
2
3
4
Felt
tacks
P 4
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Please retain product label and instructions for future reference
15
a
9
b
15
Step 7
Attach the “L” brackets to each end
of the roof frame using 2x20mm
screws per bracket.
*Ensure the end plate of each “L” bracket is
flush with the end of the framing.
Secure the roof frame inbetween the
plain gable & the door gable (
make
sure the roof frame is level with the top
of each gable
) and secure into position
using 2x30mm screws per bracket.
4x20mm Screws
4x30mm Screws
a
b
Step 8
Fix 1x eaves frame to each OSB roof
sheet, securing into place using
3x30mm screws per roof section.
*Ensure framing is flush with the OSB sheet.
Place the assembled roof sections onto
the building fixing into place with
10x30mm screws per roof section.
26x30mm Screws
b
b
b
b
b
Step 9
Once the roof is fitted, secure the
building to the floor with 22x50mm
screws.
*Ensure to screw through the framing
into the floor bearers.
22x50mm Screws
b
Step 10
Roll the felt across the roof leaving
approximately 50mm of overhang
around the building.
Fix the felt into place with 60x felt
tacks at 100mm intervals.
60x Felt Tacks