Rev. 1.1
Assembly Instructions - MINI-Full-Jet Valve VMS-08
Page 10 of 16
Walther Systemtechnik GmbH
– D 76726 Germersheim
Telefon: +49 (0)7274-7022-0 Telefax: +49 (0)7274-7022-91
http://www.walther-2000.de
6.4 Turning on
Turn on energy supply.
Turn on supply for atomizer air, control air and material.
Use the control unit to start device.
Check device for correct function and proper operation.
Check if device operation stays within all set parameters.
6.5 Turning off
Use the control unit to turn device off.
Turn off supply for atomizer air, control air and material.
Turn off energy supply.
7 Taking out of Service
7.1 Short Interruption
After short interruptions (15 min and more), the valve should be sprayed free prior to use.
NOTE
Please refer to the operating instructions!
7.2 Long-term Interruption
Please observe the procedure stated below when taking the device out of service for longer periods of time:
Turn off pressure for material supply
Clean MINI-full-jet valve with special thinner
NOTE
Please refer to the maintenance instructions!
7.3 Shutdown of Device
Please observe the procedure stated below, when finally shutting down the device:
Clean the MINI full-jet valve with special dilution.
NOTE
Please refer to the maintenance instructions!