Revision 3
7
Product Manual ALB-01, 03 & 05
5. Installation and Commissioning
5.1.
Package Contents
Before you begin the installation, make sure that you have the following items:
✓
1 off Product manual.
✓
1 off ALB Bath tub moulding complete with fitted overflow nozzle.
✓
1 off
Bath Waste outlet (1½”) with 2 seal washers, clamp nut & overflow
pipe kit.
✓
1 off bath waste plug.
✓
2 off bath to frame Lock Plates with fixing screws.
✓
1 off Bath Tap assembled with 2 off Piezo touch button (1 off red, 1 off
blue).
✓
2 off ¾” BSP flanged lock nuts.
✓
2 off 22mm x ¾” BSP push fit straight tap connectors.
✓
2 off solenoid valves & cables. Supplied with 4 off 22mm x ¾” BSP push fit
connectors.
✓
2 off ø22mm x 100mm long copper pipes.
✓
1 off Electronic Control Unit model WDC100-1 (or optional WDC200).
✓
1 off Bath Installation sheet (to suit relevant side panel set).
✓
1 off Bath Frame. (Optional extra, sold separately).
✓
1 off Bath panels with fixing screws (Note panels supplied will vary
according to bath model).
o
Model ALB-01 includes two side panels & one end panel.
o
Model ALB-03 includes one side panel & one end panel.
o
Model ALB-05 includes one side panel.
5.2.
Site Preparation
WARNING! To maintain the anti-ligature and anti-vandal properties of this
product it must be
installed in line with
the following points:
Summary of Contents for ALB-01
Page 1: ...Product Manual ALB 01 03 05 Solid Surface Bath Tap Electronic Control ...
Page 2: ...Revision 3 2 Product Manual ALB 01 03 05 AS 3498 Certificate No 23167 ...
Page 10: ...Revision 3 10 Product Manual ALB 01 03 05 Figure 2 Typical Bath Installation sht 1 ...
Page 11: ...Revision 3 11 Product Manual ALB 01 03 05 Figure 3 Typical Bath Installation sht 2 ...
Page 19: ...Revision 3 19 Product Manual ALB 01 03 05 Notes PAGE INTENTIONALLY LEFT BLANK ...