background image

Installation

 

Installation Requirements 

NOTE:  It is most important that this appliance is installed correctly and that operation is correct 

before use.  Installation shall comply with local electrical and health and safety 
requirements. 

 

Waldorf Deep Fryers are designed to provide years of satisfactory service, and correct installation is  

essential to achieve the best performance, efficiency and trouble-free operation. 
This appliance must be installed in accordance with National installation codes and in addition, in  

accordance with relevant National / Local codes covering electrical, fire safety and health and safety. 

 

Australia / New Zealand  AS / NZS3000   - Wiring Rules. 

United Kingdom: 

BS 7671 

 - Requirements for Electrical Installations. 

 

Installations must be carried out by authorised persons only.  Failure to install equipment to 

relevant codes and manufacturers specifications in this section will void warranty. 

 

Unpacking 



Remove all packaging and transit protection from appliance including all protective plastic coating 
from door outer panel and exterior stainless steel panels. 



Check equipment and parts for damage.  Report any damage immediately to carrier and distributor. 



Report any deficiencies to distributor who supplied appliance. 



Check available electrical supply is correct to as shown on rating plate located on inside of access 
door. 



Check the following parts have been supplied with appliance: 

 

 FNL8127E 

FNL8224E 

Baskets 2 

Lid 1 

Drain Extension 

 

Location 

1. 

Any appliance requires adequate clearance and ventilation for optimum and trouble-free operation.  

Minimum installation clearances shown below are to be adhered to. 

2. 

Position the Deep Fryer in its approximate working position. 

3. 

Legs must always be fitted.  Ensure that the legs are securely attached. 

 

Clearances 

NOTE: 



Only non-combustible materials can be used in close proximity to this appliance. 



To allow easy operation, drainage and servicing of the appliance, a minimum of 600mm 
clearance should be maintained at front of appliance. 

 

Assembly 

This model is delivered completely assembled.  Ensure that the legs are securely attached. 

 

NOTE: 



This appliance is fitted with adjustable feet so that the appliance can be positioned  
securely and level.  This should be carried out on completion of electrical connection.   
Refer to 'Electrical Connection' section overleaf. 

 
 

Optional Accessories (Refer to Replacement Parts List) 



Rear Roller Kit.  For installation details, refer to instructions supplied with each kit. 



Plinth Kit.  For installation details, refer to instructions supplied with each kit. 

 

Combustible Surface 

Non Combustible Surface 

Left / Right Hand Side 

50mm 

0mm 

Rear 

25mm 

0mm 

Summary of Contents for FNL8127E

Page 1: ...I n s t a l l a t i o n a n d O p e r a t i o n M a n u a l Electric Deep Fryer Date Purchased Serial Number Dealer Service Provider 236002 1 For use in GB IE FNL8127E FNL8224E...

Page 2: ...es tel 1800 337 963 Customer Service tel 1800 335 315 fax 1800 350 281 CANADA Serve Canada Web www servecanada com E Mail info servecanada com Sales tel 800 551 8795 Toll Free Service tel 800 263 1455...

Page 3: ...5 Installation Requirements Unpacking Location Clearances Assembly Electrical Connection Commissioning Operation 7 Operation Guide Description of the Controls Operation of the Appliance Filling the T...

Page 4: ...ST BE TAKEN BY THE OPERATOR TO USE THE EQUIPMENT SAFELY TO GUARD IT AGAINST RISK OF FIRE THE APPLIANCE MUST NOT BE LEFT ON UNATTENDED IT IS RECOMMENDED THAT A REGULAR INSPECTION IS MADE BY A COMPETENT...

Page 5: ...e g H05 RN F with sufficient current carrying capacity cable sizes The branch supply line shall be overload protected The point of connection shall be as close as practicable to the appliance have an...

Page 6: ...4 Dimensions FNL8127E FNL8224E...

Page 7: ...pplied appliance Check available electrical supply is correct to as shown on rating plate located on inside of access door Check the following parts have been supplied with appliance FNL8127E FNL8224E...

Page 8: ...at all cover panels have been re fitted Check the unit functions in accordance with the operating instructions Ensure the tank drain extension and this instruction manual are left with appliance Ensur...

Page 9: ...When main power switch is ON Heating ON Indicator When thermostat is turned to a selected temperature Temperature Control Knob Temperature Graduations 60 C to 200 C Operating the reset switches resets...

Page 10: ...ll hold 11kg of shortening per tank Pre Heating NOTE When pre melting shortening only heat the shortening until it is just liquefied Do not bring the shortening up to high temperature as handling of h...

Page 11: ...E Fryer features a split tank allowing distinctive products to be cooked in individual pans and at different temperatures This allows products to be fried separately to prevent flavour contamination b...

Page 12: ...lean and operating at peak efficiency follow the procedures below Draining and Daily Cleaning 1 At end of each day or at end of each shift if frying schedule is heavy frying medium should be drained a...

Page 13: ...ot frying medium from container and pour around sides and bottom of tank to wash out crumbs and particles adhering to tank 9 Rotate the elements to the vertical Cleaning position Fig 7 and continue to...

Page 14: ...f the tank 6 Empty the fryer and rinse thoroughly with water Use a 1 part vinegar to 15 parts water solution to rinse the tank and neutralise any cleaner residue Use a weaker solution of up to 1 part...

Page 15: ...ermometer or thermocouple Frying oil broken down Check amount of fresh frying medium added to fryer to be sure turnover is adequate Using wrong cooking frying medium Some frying mediums form gums when...

Page 16: ...ure fryer is perfectly dry before use Overheating of oil Check thermostat setting with a thermometer or thermocouple Insufficient oil turnover Top up daily to replace the contents of fryer in 3 to 5 d...

Page 17: ...15 Wiring Schematics FNL8224E Twin Tank Illustrated...

Page 18: ...lement Assy 7kW LH 1 232750 O Ring Element Seal 2 4 232746 O Ring Face Seal 1 2 232744 Element Retaining Pin 1 1 General 235921 Electric Fryer Basket 2 2 227856 Magnetic Catch 1 1 227451 Door Handle 1...

Page 19: ......

Reviews: