7
RECOMMENDED INSTALLATION
INTERMITTENT SAMPLING
Install accessories
either vertically or
horizontally, per
manufacturer's
instructions.
To Drain
Skimmer Blowdown Line
3/4" Min. up to Electrode
Full Port Block
Valve
Manual Blowdown
(Normally Closed)
Motorized
Ball
or Solenoid
Valve
Flow
Control
Valve or
Orifice Union
CONDUCTIVITY
ELECTRODE
¾"
Cross
2 ft.
minimum
1 to 3 ft.
maximum
10 ft. max.
with minimal valves, elbows & unions
To Drain
Skimmer Blowdown Line
3/4" Min. up to Electrode
Full Port Block
Valve
Manual Blowdown
(Normally Closed)
Motorized
Ball
or
Solenoid
Valve
Flow
Control
Valve
or Orifice
Union
CONDUCTIVITY
ELECTRODE
Flow
Control
Valve or
Orifice Union
RECOMMENDED INSTALLATION
CONTINUOUS SAMPLING
TO
DRAIN
To Drain
To Drain
Manual Clean-Out
(Normally Closed)
¾"
Cross
Manual Clean-Out
(Normally Closed)
Figure 1 Typical Installation