Mounting 27
852-1322/852-1328 Industrial Managed Switch
Manual
1.0.01
Pos: 22. 1 /Alle Se rien (
4
Mounting
Pos: 22. 2 /Seri e 85 2 (E THERNET- Zub ehö r)/ Monti ere n/M onta geo rt 8 52- x30x @ 24 \mo d_1 452 256 5413 88_ 21. docx @ 19 7891 @ 2 @ 1
4.1
Installation Site
The location selected to install the industrial managed switch may greatly affect
its performance. When selecting a site, we recommend considering the following
rules:
•
Install the industrial managed switch at an appropriate place. See Section
“Device Description” > ... > “Technical Data” > ... > “Environmental
Conditions” for the acceptable temperature and humidity operating ranges.
Make sure that the heat output from the industrial managed switch and ventilation
around it is adequate. Do not place any heavy objects on the industrial managed
switch.
4.2
Installation on a Carrier Rail
The carrier rail must optimally support the EMC measures integrated into the
system and the shielding of the internal data bus connections.
Place the industrial managed switch onto the DIN rail from the top and snap it
into position.
4.3
Removal from Carrier Rail
To remove the industrial managed switch from the carrier rail, insert a suitable
tool into the metal tab under the switch and deflect the metal tab downward.
You can then release the switch down from the carrier rail and remove it
upwards.