WAGO-I/O-SYSTEM 750 XTR
Appendix 283
750-495/040-00x 3-Phase Power Measurement Module 690 V
Manual
Version 1.2.0
Table 63: CSV File “Snapshot” (Example of 4-Wire Wye)
I/O-Check 3-Phase Power Measurement (750-495/040-000)
Errors/warnings
Parameters Phase L1
Overvoltage limit
410 V
Overcurrent limit
5000000 A
Interval observation:
arithm. mean calculation
60 s
Interval observation: peak value
measurement
10 half-waves
Take current transformer ratio into
account
False
Automatic reset of the min./max. values False
Current transformer ratio
500
Undervoltage limit
10 V
Interval – reset: min./max. values
2000 ms
Parameters Phase L2
Overvoltage limit
410 V
Overcurrent limit
5000000 A
Interval observation:
arithm. mean calculation
60 s
Interval observation: peak value
measurement
10 half-waves
Take current transformer ratio into
account
False
Automatic reset of the min./max. values False
Current transformer ratio
700
Undervoltage limit
10 V
Interval – reset: min./max. values
2000 ms
Parameters Phase L3
Overvoltage limit
410 V
Overcurrent limit
5000000 A
Interval observation:
arithm. mean calculation
60 s
Interval observation: peak value
measurement
10 half-waves
Take current transformer ratio into
account
False
Automatic reset of the min./max. values False
Current transformer ratio
200
Undervoltage limit
10 V
Interval – reset: min./max. values
2000 ms