
40
Delivery scope
No.
Quantity
Designation
1
1
Monitor-kit RV-52
(see
.
C)
1.1
1
Monitor
1.2
1
Anti-glare visor
1.3
1
Monitor holder
1.4
1
Connection cable harness
1.5
1
Distance scale
2
1
Camera kit RV-23
2.1
1
Camera
2.2
1
Camera holder
2.3
1
Camera protection cover
2.4
1
Extension cable 20 m
2.5
1
Insulation plate
2.6
4
Insulation sleeve
Tools required
The following tools are required for installation and assembly:
– Scale
(see
.
B 1)
– Dril
(see
.
B 5)
– Centre punch
(see
.
B 2)
– Screwdriver
(see
.
B 6)
– Hammer
(see
.
B 3)
– Spanner / wrench
(see
.
B 7)
– Bits
(see
.
B 4)
The following tools are required for the electrical connection
and testing:
– Diode test lamp (see
.
B 8)
– Thermal shrinking hose
or voltmeter
(see
.
B 9)
– Hot-air dryer
(see
.
B 12)
– Crimping pliers
(see
.
B 10)
– Soldering bi
(see
.
B 13)
– Insulation tape
– Tin-lead solder
(see
.
B 14)
You may need other screws, nuts, washers, tapping screws and
binders for fastening the camera and monitor than those contained in the
delivery scope depending upon the individual installation.
Summary of Contents for PerfectView CRT300
Page 3: ...3 A Nicht ziehen Not pull b c a Nicht öffnen Don t open 1 3 2 4 5 6 7 8 9 ...
Page 4: ...4 B 2 4 3 5 6 10 12 13 14 8 9 7 1 11 ...
Page 5: ...5 C 1 1 2 1 1 2 1 3 1 5 1 4 3 1 3 2 3 6 3 7 3 8 3 9 10 X 3 4 3 3 3 5 2 2 2 5 2 3 2 4 2 6 ...
Page 6: ...6 E 1 2 5 4 1 2 3 4 5 17 17 10 9 8 7 6 15 11 D 3 12 13 14 16 ...
Page 7: ...7 1 2 3 4 verschiedene Punkte anzeichnen Mark 4 different points 4 5 F ...
Page 13: ...13 H 15 mm 20 mm 10 mm 1 6 11 2 7 12 3 8 4 5 10 10 mm 9 ...
Page 17: ...17 J Verdrehen Twist 1 2 Heck Ihres Fahrzeuges Rear of your vehicle ...
Page 18: ...18 K 1 2 3 Entfernungsskala Distance scale ...
Page 36: ...36 ...
Page 54: ...54 ...
Page 72: ...72 ...
Page 90: ...90 ...
Page 108: ...108 ...
Page 126: ...126 ...
Page 144: ...144 ...
Page 162: ...162 ...
Page 180: ...180 ...
Page 198: ...198 ...
Page 199: ...199 ...