P
AGE
40
M
AINTENANCE
C
HAPTER
5
S
YCON
2500
M
AINTENANCE
S
TEP
2A
→ 2B see page 42
FLUSH
FLUSH
C
LEANING OF
M
EASURING
C
HAMBER
REMOVE
,
CLEANING AND REINSTALL
1. First release pressure from water supply line
→ shut off water supply in water treatment
plant
→ switch on the unit for a while
→ Briefly press the flush button. By opening
the solenoid valve you expend the water
supply system.
2. Hold or place the small bucket under the water
inlet connection.
3. Open the connector. Unplug the 6 mm inlet
tubing
→ Briefly press the flush button. By opening
the solenoid valve, the measuring chamber
drains almost completely.
→ collect leaking water in the bucket
→
switch off the unit again
4. Pull the locking pins out of the holes and pull
the plugs in sequence from the measuring
chamber
→ pry fixed plug gently with a screw driver.
5. remove measurement chamber by pulling from
the retaining bolts
→ Empty the measuring chamber
→ Insert Measuring chamber for about 10
minutes in sufficient quantity of cleaning
liquid in the box of cleaning set
→ Clean the measuring chamber carefully
with the brush of cleaning set
→ rinse measuring chamber with clean water.
6. Clean the plugs
7. Remove the measuring chamber in the reverse
order of disassembly
WARNING
WARNING