Operation
PS (3-Phase) Series
wc_tx000123gb.fm
12
4.2
Prior to Operation
When the pump is delivered, first perform the following checks:
•
Inspection
While unpacking, inspect the product for damage during shipment, and
make sure all bolts and nuts are tightened properly.
•
Specification check
Check the model number to make sure it is the product that was
ordered. Be certain it is the correct voltage and frequency.
Note:
If there is any problem with the product as shipped, contact your
nearest dealer or Wacker representative at once.
•
Product specifications
Do not operate this product under any conditions other than those for
which it is specified. Failure to observe this precaution can lead to
electrical shock, current leakage, fire, water leakage or other
problems.
CAUTION
Summary of Contents for PS 2 1503
Page 1: ...Pump PS 3 Phase Series OPERATOR S MANUAL 0154626en 002 0409 0 1 5 4 6 2 6 E N ...
Page 2: ......
Page 4: ...Table of Contents PS 3 Phase Series wc_bo0154626002enTOC fm 2 ...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......