PS (3-Phase) Series
Maintenance
wc_tx000124gb.fm
23
5.
Maintenance
5.1
Periodic Maintenance Schedule
Pump
Monthly
Every
3000
hrs.
Every
6000
hrs.
Every
2–5
years
Measure insulation resistance.
Reference insulation resistance =
1M
W
or greater. (1)
•
Measure operating current.
Compare with rated current.
•
Measure supply voltage. Compare with allowable
range (within ±5% of rated voltage).
•
Pump inspection. A noticeable drop in performance
may indicate wear in the impeller, etc., or else clog-
ging of the strainer, etc. Remove the clogged debris
and replace any worn parts.
•
Lubricant inspection.
•
Change lubricant.
•
Designated lubricant: SAE 10W/20W. (2)
Change mechanical seal. (3)
•
Overhaul. This should be carried out even if there
are no problems with the pump. The frequency
depends on how continuously the pump is in use. (4)
•
(1)
If the insulation resistance has become noticeably lower than the previous
inspection, an inspection of the motor will be necessary.
(2)
See Lubricant Inspection and Change in this section.
(3)
Specialized knowledge is required for inspecting and replacing the mechanical
seal. Consult with your nearest dealer or Wacker representative.
(4)
Consult with your nearest dealer or Wacker representative regarding overhauls.
Summary of Contents for PS 2 1503
Page 1: ...Pump PS 3 Phase Series OPERATOR S MANUAL 0154626en 002 0409 0 1 5 4 6 2 6 E N ...
Page 2: ......
Page 4: ...Table of Contents PS 3 Phase Series wc_bo0154626002enTOC fm 2 ...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......