2.17
Remote run terminal block
Location
The remote run terminal block (i) is located just to the left of the convenience
receptacle circuit breakers.
Description
The remote run terminal block provides connection points for installation of a
remote start switch. When it is connected to a transfer switch, it allows the
generator to be used as a stand-by power supply.
Connections
When connecting a remote start switch or transfer switch, use the inner two
terminals on the remote run terminal block.
Note:
The bonding bar between the ground connections must remain in place at all
times unless a qualified electrician determines otherwise.
wc_gr005194
i
Summary of Contents for G 150
Page 1: ...Mobile Generator G 150 G 180 G 240 OPERATOR S MANUAL 0171953en 003 0709 0 1 7 1 9 5 3 E N ...
Page 2: ......
Page 4: ...Foreword G 150 180 240 wc_tx000869gb fm 4 ...
Page 12: ...Safety Information G 150 180 240 wc_si000265gb fm 12 wc_si000265gb fm 12 1 6 Label Locations ...
Page 13: ...G 150 180 240 Safety Information wc_si000265gb fm 13 wc_gr005517 G H J R GG FF R A H K ...
Page 63: ...Factory Installed Options wc_tx000880gb fm 63 Notes ...