
ghi_tx001162gb.fm
82
Accessories
E 3000
5.4
Expanded Operation Using Two HHS 3002 and Two DPP
Requirements
Machine stopped
Two HHS 3002 Hose Handling Systems
Two DPP Dual Pump Packs
Two 2-1 adapters
Procedure
Perform the procedure below to expand the machine with two Hose Handling
Systems (HHS) and two Dual Pump Packs (DPP).
1. Position the E 3000 near the application area.
2. Position both DPP
(a
and
m)
near the application area.
3. Unwind and position the hose
(b)
from the left reel of the E 3000 within the
application area.
4. Unwind and position the hose
(c)
from the right reel of the E 3000 within the
application area.
5. Connect one 2-1 adapter
(i)
to return port
(g)
.
6. Connect the other 2-1 adapter
(j)
to return port
(h)
.
7. Unwind and position the hose loop 1
(d)
from the first HHS 3002
(f)
within the
application area.
a. Connect the male quick-connect to the 2-1 adapter
(j)
.
b. Connect the female quick-connect to the DPP
(a)
.
8. Unwind and position the hose loop 2
(e)
from the HHS 3002
(f)
within the
application area. Place the HHS 3002 frame in a safe place.
a. Connect the male quick-connect to the 2-1 adapter
(j)
.
b. Connect the female quick-connect to the DPP
(a)
.
9. Unwind and position the hose loop 1
(k)
from the second HHS 3002
(n)
within
the application area.
a. Connect the male quick-connect to the 2-1 adapter
(i)
.
b. Connect the female quick-connect to the DPP
(m)
.
10.Unwind and position the hose loop 2
(l)
from the second HHS 3002
(n)
within
the application area. Place the HHS 3002 frame in a safe place.
a. Connect the male quick-connect to the 2-1 adapter
(i)
.
b. Connect the female quick-connect to the DPP
(m)
.
11.Connect the leader hose of the DPP
(a)
to the accessory supply port
(#1)
.
12.Connect the leader hose of the DPP
(m)
to the accessory supply port
(#7)
.
13.Connect the electric cord of the first DPP to the Auxiliary Pump Panel. See topic
Mounting the Auxiliary Pump Panel
.
14.Connect the electric cord of the second DPP to the duplex receptacle of the
E 3000.
Result
The machine is now ready for expanded operation.
This procedure continues on the next page.
Summary of Contents for E 3000 LB
Page 6: ...Foreword wc_tx002028gb fm 6 ...
Page 39: ...ghi_tx001160gb fm 39 E 3000 Lifting and Transporting Notes ...
Page 77: ...wc_tx001951gb fm 77 E 3000 Operation Notes ...
Page 97: ...ghi_tx001162gb fm 97 E 3000 Accessories wc_gr008560 a b LR RR RS LS HX 50 HX 50 ...
Page 99: ...ghi_tx001162gb fm 99 E 3000 Accessories wc_gr008561 a LR LS HX 50 ...
Page 103: ...ghi_tx001162gb fm 103 E 3000 Accessories wc_gr008582 HX 100 HX 100 a b LR RR LS RS ...
Page 105: ...ghi_tx001162gb fm 105 E 3000 Accessories wc_gr008583 HX 100 a LR LS ...
Page 182: ...MSDS Dowfrost HD 50 ...
Page 186: ...wc_tx001673gb fm 186 Fuji Temperature Controller ...
Page 199: ...Tire Safety Information ...
Page 201: ...wc_tx001952gb fm 201 E 3000 Schematics 12 2 Composite Schematic Machine with Gas Burner ...
Page 205: ...wc_tx001952gb fm 205 E 3000 Schematics 12 4 Circulation System Circuit ...
Page 206: ...wc_tx001952gb fm 206 Schematics E 3000 12 5 Rewind System Circuit ...
Page 207: ...wc_tx001952gb fm 207 E 3000 Schematics 12 6 Gas Train Schematic ...
Page 208: ...wc_tx001952gb fm 208 Schematics E 3000 12 7 Generator ...
Page 213: ......