
ghi_tx001160gb.fm
31
E 3000
Lifting and Transporting
3.2
Preparing the Machine for Transport on a Truck or Trailer
Requirements
Machine stopped
.
Flatbed truck or trailer capable of supporting the machine’s weight.
Chains, hooks, or straps capable of supporting the machine’s weight.
Checklist
Before transporting the machine, check the following items:
Machine
Check that all accessories are securely stored within the machine.
Check that all doors and access panels of the machine are closed.
Check that all electrical supplies are disconnected from the machine.
For machines with external fuel supplies, check that all fuel supplies are
disconnected from the machine.
For machines with generators, check that the generator is shut down.
Loading and transporting equipment
Check that the transport vehicle or trailer can support the weight of the machine.
Check that the transport vehicle or trailer is wide enough to support the
machine.
Check that the wheels of the transport vehicle or trailer are chocked during the
loading process.
Check that the transport vehicle or trailer is clean and free of grease, oil, ice,
and other loose material.
If the machine is mounted to a trailer, check that the jackstand or other transport
block (piece of wood or other similar material) is available to support the trailer
tongue during transporting. Do not use the machine’s trailer jack to support the
trailer tongue during transporting.
Check that any ramps used in the loading process:
Can support the weight of the machine
Are clean and free of grease, oil, ice, and other loose material.
Are securely connected to the transport vehicle or trailer.
Are of sufficient length to keep the loading angle 15° or less.
In addition:
Check that the loading area is flat and the ground is stable.
Check the overall height of the machine once loaded. Plan your travel route so
there will be adequate clearance for overpasses, road signs, buildings, etc.
Check local regulations regarding transporting and obey these regulations.
WARNING
Crushing hazard. Improperly securing the machine can lead to a crushing hazard.
f
Use only the designated tie-down points to secure the machine to a truck or
trailer.
Summary of Contents for E 3000 LB
Page 6: ...Foreword wc_tx002028gb fm 6 ...
Page 39: ...ghi_tx001160gb fm 39 E 3000 Lifting and Transporting Notes ...
Page 77: ...wc_tx001951gb fm 77 E 3000 Operation Notes ...
Page 97: ...ghi_tx001162gb fm 97 E 3000 Accessories wc_gr008560 a b LR RR RS LS HX 50 HX 50 ...
Page 99: ...ghi_tx001162gb fm 99 E 3000 Accessories wc_gr008561 a LR LS HX 50 ...
Page 103: ...ghi_tx001162gb fm 103 E 3000 Accessories wc_gr008582 HX 100 HX 100 a b LR RR LS RS ...
Page 105: ...ghi_tx001162gb fm 105 E 3000 Accessories wc_gr008583 HX 100 a LR LS ...
Page 182: ...MSDS Dowfrost HD 50 ...
Page 186: ...wc_tx001673gb fm 186 Fuji Temperature Controller ...
Page 199: ...Tire Safety Information ...
Page 201: ...wc_tx001952gb fm 201 E 3000 Schematics 12 2 Composite Schematic Machine with Gas Burner ...
Page 205: ...wc_tx001952gb fm 205 E 3000 Schematics 12 4 Circulation System Circuit ...
Page 206: ...wc_tx001952gb fm 206 Schematics E 3000 12 5 Rewind System Circuit ...
Page 207: ...wc_tx001952gb fm 207 E 3000 Schematics 12 6 Gas Train Schematic ...
Page 208: ...wc_tx001952gb fm 208 Schematics E 3000 12 7 Generator ...
Page 213: ......