![Wacker Neuson DT10 Operator'S Manual Download Page 68](http://html2.mh-extra.com/html/wacker-neuson/dt10/dt10_operators-manual_3065757068.webp)
5-6
BA DT10 en - Edition 1.5 * * dt10b510.fm
Maintenance
The substructure must be raised and the maintenance prop installed for maintenance and
service work. Perform the starting aid as follows:
☞
Unscrew screws
A
☞
With the skip fully tilted, raise the substructure by pressing on the upper edge of the skip
☞
Remove the maintenance prop
B
from the transport bracket
☞
Insert the maintenance prop
B
in the corresponding bracket
☞
Secure the maintenance prop
B
with the screws
A
Fig. 67: Maintenance prop
A
Fig. 68: Maintenance prop
Fig. 69: Maintenance prop
B
A
Summary of Contents for DT10
Page 5: ...BA DT10 en Edition 1 5 BaDT10en1_5IVZ fm I 3 Table of Contents...
Page 8: ...I 6 BA DT10 en Edition 1 5 BaDT10en1_5SIX fm Index...
Page 16: ...1 8 BA DT10 en Edition 1 5 dt10b110 fm Introduction 1 7 Signs and symbols XX XX...
Page 20: ...1 12 BA DT10 en Edition 1 5 dt10b110 fm Introduction...
Page 38: ...3 8 BA DT10 en Edition 1 5 dt10b320 fm Operation...
Page 89: ...BA DT10 en Edition 1 5 dt10b520 fm 5 27 Maintenance...
Page 98: ...5 36 BA DT10 en Edition 1 5 dt10b530 fm Maintenance...