![Wacker Neuson CT 36-400E Operator'S Manual Download Page 27](http://html1.mh-extra.com/html/wacker-neuson/ct-36-400e/ct-36-400e_operators-manual_3136278027.webp)
CT 36-400E
Maintenance
27
3.3
Belt Replacement
See Graphic: wc_gr003538
On new machines or after installing a new belt, check belt tension after
the first 20 hours of operation. Check and adjust belt every 100 hours
thereafter.
To change the belt:
3.3.1
Make sure that the trowel is unplugged from any electrical supply.
3.3.2
Loosen the screws (d) and remove the belt guard (c).
3.3.3
Loosen the motor plate jam nuts (e). Slide plate toward handle to
loosen belt.
3.3.4
Slowly turn pulley (b) and roll belt (a) off.
Note: The pulleys are aligned at the factory and neither should be
removed during belt replacement.
3.3.5
Install new belt on the pulleys. Adjust tension on belt by moving the
motor plate. Belt deflection should be 6–10 mm (1/4–3/8"), checked
half way between the pulleys. Tighten the jam nuts. Torque the screws
to 25 Nm (18 ft.lbs.).
3.3.6
Reattach the belt guard with washers and screws. Torque the screws
to 5 Nm (3.7 ft.lbs.).
wc_gr003538
6–10 mm
(1/4–3/8 in.)
a
b
c
d
e
Summary of Contents for CT 36-400E
Page 1: ...Trowel CT 36 400E OPERATOR S MANUAL 0159491en 002 1108 0 1 5 9 4 9 1 E N ...
Page 2: ......
Page 4: ...Foreword wc_tx000001gb electric fm 4 ...
Page 11: ...CT 36 400E Safety Information 11 1 4 Label Locations l o 2 l 2 l o o l l 2 l 2 o ...
Page 25: ...CT 36 400E Operation 25 1 2 wc_gr003239 a b c d ...
Page 32: ...Maintenance CT 36 400E 32 Notes ...
Page 36: ......
Page 37: ......
Page 50: ...AEM_ConcretePowerTrowel qxd 7 23 03 6 31 AM Page 1 ...