3. Referring to Figure 1-11, note that there is no difference in the left
and right shelf channels.
4. Install the shelf channels by placing the channel’s rear slot over the
appropriate rear tab on the side duct. Pull the shelf channel forward
and engage the channel’s front slot into the side duct’s appropriate
forward tab. Refer to Figure 1-12.
5. Figure 1-11 shows one of the channels installed on the right side duct.
6. Locate the supplied rod, spring and end pieces; 4 each. Assemble the
spring to the rod by positioning the very end of the spring over the
ridge at the rod. Then press the spring to the opposite side. It should
snap into place. See Figures 1-13 and 1-14.
7. Slide end cap over spring (Figure 1-15).
Note
When installing the rods, the
spring end can be installed on either
side of the chamber. The upper front
rod is high in the chamber and the
upper back rod is lower to allow access
to the access port filter door.
Air Jacketed CO2 Incubator
1-7
VWR International
Section 1
Installation and Start-Up
Duct Sheet and Shelf
Installation (continued)
S
i
de
Duct
S
i
de
to
w
ard
s
i
de
duct
S
i
de
to
w
ard
she
l
f
R
i
ght
S
i
de
Duct
wi
th
She
l
f
Channe
l I
nsta
ll
ed
She
l
f Channe
l
s
S
i
de
duct
tab
She
l
f
channe
l
rear
s
l
ot
She
l
f
channe
l
front
s
l
ot
S
i
de
duct
tab
Figure 1-11.
Shelf Channels & Side Ducts
Figure 1-12.
Channels and Slots
Figure 1-13.
Spring End
Spring
end
Ridge
Figure 1-15.
Spring End
Figure 1-14.
Spring Assemble to Rod