Fig. 24
4.
Reverse procedure to install new relay.
5.
Reinstall power supply box and check operation.
120 Volt Transformer
1.
2.
Note location of wiring on 120 volt transformer
and remove wiring.
3.
Remove screws and remove transformer from
the box.
Fig. 25
4.
Reverse procedure to install new transformer.
5.
Reinstall power supply box and check operation.
POWER SUPPLY BOX
COMPONENTS AFTER 12/1/12
NOTE:
Power supply boxes built after 12/1/12 have
different components in them. The 24 volt electronic
ignition relay, blower control board, ignition module
and both time delay relays are replaced by a single
control board.
NOTE:
The new ignition module will not have a
separate flame sense rod and wire. Ignition module
will rectify flame through high voltage wire.
120 Volt Transformer
1.
2.
Note location of all wiring and remove wiring from
transformer.
3.
Remove four screws and remove transformer
from box.
VK and TR GAS FRYERS W/Wo KleenScreen PLUS - REMOVAL AND REPLACEMENT OF PARTS
Page 15 of 55
F45474 (0413)