__________________________________________________________________________________
10
5 It may be necessary to pull the heat shield bottom out slightly in order to clear the flue
box. Be sure the backsplash is resting evenly and the channel holes are lining up with
the holes provided in the right- and left-
hand body side (see Fig’s. 3 & 4).
Fig. 3 Fig. 4
Fig. 5
6. Install six #10 sheet metal screws (3 to each channel leg) (Fig. 5).