GR SERIES GAS FRYERS - REMOVAL AND REPLACEMENT OF PARTS
4. Reverse procedure to install and check for proper
operation.
BASKET LIFT TUBE
WARNING:
DISCONNECT THE
ELECTRICAL POWER TO THE
MACHINE AND FOLLOW LOCKOUT /
TAGOUT PROCEDURES. THERE MAY
BE MULTIPLE CIRCUITS. BE SURE
ALL CIRCUITS ARE DISCONNECTED.
1. Remove basket lift cover as outlined in “BASKET
LIFT COVERS” under “COVERS AND PANELS”.
2. Remove nut securing lift bar to the lift tube.
3. Remove screws securing lift tube bracket to fryer
then remove bracket and lift tube.
4. Reverse procedure to install.
BASKET LIFT MOTOR
WARNING:
DISCONNECT THE
ELECTRICAL POWER TO THE
MACHINE AND FOLLOW LOCKOUT /
TAGOUT PROCEDURES. THERE MAY
BE MULTIPLE CIRCUITS. BE SURE
ALL CIRCUITS ARE DISCONNECTED.
1. Remove basket lift cover as outlined in “BASKET
LIFT COVERS” under “COVERS AND PANELS”.
2. Remove basket lift tube as outlined under “BASKET
LIFT TUBE”.
3. Disconnect lead wires from cam switch and basket lift
motor.
4. Loosen set screws securing crank arm assembly to
the basket lift motor shaft.
Summary of Contents for GRC35
Page 29: ... 29 F 25114 Rev A 07 03 GR SERIES GAS FRYERS ELECTRICAL OPERATION COMPONENT LOCATION ...
Page 30: ... 30 F 25114 Rev A 07 03 GR SERIES GAS FRYERS ELECTRICAL OPERATION POWER SUPPLY BOX ...
Page 37: ... 37 F 25114 Rev A 07 03 GR SERIES GAS FRYERS ELECTRICAL OPERATION ...
Page 39: ... 39 F 25114 Rev A 07 03 GR SERIES GAS FRYERS ELECTRICAL OPERATION ...
Page 41: ... 41 F 25114 Rev A 07 03 GR SERIES GAS FRYERS ELECTRICAL OPERATION Frymate Dump Station ...
Page 48: ... 48 F 25114 Rev A 07 03 NOTES GR SERIES GAS FRYERS ...