ENGLISH
29
V.4. Modification of operator parameters (password 3333 required)
V.4.a. Setting different time and date clocks
V.4.a.1. Date and time of the CORRIGO controller [(1) section V.3.d]
Access: Timer/Time Date Setting
The date and time of the controller are pre-set in the CORRIGO. The changeover between the Summer and Winter schedules
is managed automatically.
V.4.a.2. Programming system operation times [(2) (3) chapter V.3.d]
Access:
Normal speed pgr:
Times/normal speed program setting
•
Low speed pgr:
Times/low speed program setting
•
The system is programmed to operate at normal speed (HS-1/1)
07:00 - 22:00
at low speed (LS-1/2)
22:00 - 06:00
except
for
DIVA
®
/ LOBBY
®
/ QUATTRO
®
versions, which are permanently set to operate at low speed (LS-1/2)
As shown in the diagram, it is also possible to modify the periods from Monday to Friday, by pressing the right-hand button
when on the Monday screen
Note: if low speed (LS-1/2) and normal speed (HS-1/1) are both active in the same time period, the system will operate in HS
Operating exceptions:
DIVA
®
/QUATTRO
®
: In order for the CO2 control function to work, there must be no active time periods in normal
speed (HS-1/1)
LOBBY
®
: Only the low speed timer (LS-1/2) must be active.
NIGHT COOLING: This function is only to be activated when the system is operating at low speed (LS-1/2) or is in
shutdown between the hours of 00:00 and 07:00. (Example: If the system is in low speed (LS-1/2) between 02:00
and 06:00 and in
normal speed (HS1/1) for the rest of the time. In this case, the NIGHT COOLING function will only operate from
02:00 to 06:00)
V.4.a.3. Vacation period [
(4)
section V.3.d] (password 3333 required)
Access: Setting Timers/Vacations
The system has no pre-set vacation periods. If you wish to reduce the operating times during vacations, set the operating
periods for vacations as described in section V.3.4), then set the vacation days.
V.4.b. Modification of speed/pressure in LS and HS
V.4.b.1. EH / DIVA
®
/ [
(5)
section V.3.c]
Access: VAS 1/1 and 1/2 Ventilation control/Frequency control or VAR 1/1 and 1/2 Frequency control
You can change the rotation speed of each fan in the system to LS-1/2 (low speed) and HS-1/1 (high speed) in order to
adjust the air flow rate.
To adjust the initial flow rate (HS-1/1), set the system to normal speed using the available “Forced HS run” terminals
•
(bridge across terminals 11 and 12).
To adjust the initial LS flow rate, set the system to low speed using the available “Forced LS run” terminals (bridge
•
across terminals 9 and 10).
V.4.b.2. LOBBY
®
[
(5)
section V.3.c]
Access: VAS 1/2 ventilation control/pressure control or VAR 1/2 pressure control
You can change the constant system pressure for each fan in order to adjust the flow rate.
To adjust the initial LS flow rate, set the system to normal speed using the available “Forced LS run” terminals (bridge across
terminals 9 and 10).
V.4.b.3. MAC2
®
/QUATTRO
®
[
(5)
section V.3.c]
Access: Fan control/VAS flow rate control 1/1 and 1/2 or VAR pressure control 1/1 and 1/2 You can modify the flow rate of
each individual fan in the system in order to control the flow rates.
To adjust the initial flow rate (HS-1/1), set the system to normal speed using the available “Forced HS run” terminals
•
(bridge across terminals 11 and 12).
To adjust the initial LS flow rate, set the system to low speed using the available “Forced LS run” terminals (bridge
•
across terminals 9 and 10).
!
Summary of Contents for VORT NRG 1500 ECR
Page 40: ...ENGLISH 40 VIII APPENDICES VIII 1 Control diagram ROUE WHEEL FUSE CLAMP...
Page 50: ...ENGLISH 50 IX NOTES...
Page 83: ...FRAN AIS 83 VIII ANNEXES VIII 1 Sch ma de commande...
Page 93: ...FRAN AIS 93 IX NOTES...
Page 126: ...DEUTSCH 126 VIII ANLAGEN VIII 1 Schaltplan der Steuerung ROUE RAD MORSETTO FUSIBILE...
Page 136: ...DEUTSCH 136 IX ACHTUNG...