Summary of scheduled maintenance
The “Checks and Tests” of the safety systems and
details of other maintenance work must be recorded in
an “Appliance Book” as per the above schedule.
The periods expressed are to be taken as days of
continuous appliance operation lasting 12 hours per
day. Periods of operation that are longer or shorter
than 12 hours per day count as fractions of scheduled
maintenance periods.
The “Checks and Tests” for safety systems and
the greasing of bearings fitted with grease nipples
must be carried out at least once a year even if the
appliance is not used much.
Cleaning
Always comply with all regulations regarding the
disposal of solid and special waste, with particular
reference to the lubricants used on the fan and motor
bearings and all the other substances which, carried
on the air, may have accumulated inside the appliance.
14
14
19
ENGLISH
15
15
15
days
30
days
60
days
90
days
180
days
12
months
Safety systems
- checks and tests
**
Motors, fans,
drive system
- belts, check
- belts, replacement
- bearings, possible
replacement
**
**
**
Air filters
- check
- cleaning and
replacement
**
**
Vents
- check
**