45
ENGLISH
QE-SPF
Aesthetic wall spacer frame
(fig. 1÷4)
Fig.1: QE SPF assembly to cover adapter QE FBA.
Fig.2: QE SPF assembly to cover the irregular edges of holes in walls.
Fig.3: QE SPF assembly to hide a protrusion from the plasterboard box (rear discharge).
Fig.4: Final assembly: position the front QE panel on the QE-SPF frame.
QE-CFR
Infill frame
(fig. 5÷6)
Hides imperfections due to an incorrectly finished installation on a plaster or on tiles or in openings on recesses
that are too large that the QE would not be able to cover completely. The frame is mounted between the wall
and the front part of the QE.
QE-SRK
Kit for extraction from a second room
(fig. 7÷12)
Fig 7
0 wall recessed box
1 wall flange
2 filter
3 frame
4 front panel
Fig 8
A.Maximum depth of recess: 40 mm
B.Optional screws: if used, it is necessary to drill the holes on the rear pre-recessed wall of the wall flange
Summary of Contents for 11564
Page 8: ...8 2 3 mt ...
Page 10: ...10 1 2 ...
Page 64: ...64 2 3 ...
Page 65: ...65 4 ...
Page 66: ...66 QE CFR 5 6 ...
Page 67: ...67 QE SRK 7 8 0 40 mm A B ...
Page 68: ...68 9 10 ...
Page 69: ...69 11 12 ...
Page 70: ...70 ...
Page 71: ...71 ...
Page 73: ...73 ...