
7
4.
Then, insert AC output wires according to polarities indicated on terminal block and tighten terminal screws.
Be sure to connect PE protective conductor (
)
first.
→
Ground (yellow-green)
L
→
LINE (brown or black)
N
→
Neutral (blue)
5.
Make sure the wires are securely connected.
Communication Connection
The inverter is equipped with two sets of RS-485 Modbus communication ports. RS-485-1 is for general
communication with personal computer. It will provide advanced communication and monitoring options.
RS-485-2 is for use with Li-battery. For detailed operation, please check your local dealer or installer.
After communication cable is connected well, insert bundled CD into a computer and follow on-screen
instruction to install the monitoring software. For the detailed software operation, please check user manual of
software in the CD.
Dry Contact Signal
There is one dry contact (3A/250VAC) available on the rear panel. It could be used to deliver signal to connect
external device based on different working mode.
Unit Status
Condition
Dry contact port:
NC & C
NO & C
Power Off
Unit is off and no output is powered.
Close
Open
Power On
Output is powered from Utility.
Close
Open
Output is powered from Battery.
Open
Close
CAUTION:
Appliances such as air conditioner are required at least 2~3 minutes to restart because it’s required
to have enough time to balance refrigerant gas inside of circuits. If a power shortage occurs and recovers in a
short time, it will cause damage to your connected appliances. To prevent this kind of damage, please check with
manufacturer of air conditioner to see if it’s equipped with time-delay function before installation. Otherwise, this
inverter/charger will detect overload fault and cut off output to protect your appliance but sometimes it still
causes internal damage to the air conditioner.