![VOKERA Linea Max HE Installation & Servicing Instructions Manual Download Page 2](http://html1.mh-extra.com/html/vokera/linea-max-he/linea-max-he_installation-and-servicing-instructions-manual_1044921002.webp)
43
6.3
Replacement of components
21
6.4
Component removal procedure
21
6.5
Pump assembly
21
6.6
Safety valve
22
6.7
Bottom automatic air release valves
22
6.8
Water pressure sensor/gauge
22
6.9
Primary thermistors
22
6.10 Return thermistors
22
6.11 Printed circuit board
22
6.12 Gas valve
22
6.13 Electrode and condense sensor
23
6.14 Flue fan & mixer
23
6.15 Burner
23
6.16 Main heat exchanger
23
6.17 Flow restrictor
24
6.18 DHW flow switch
24
6.19 DHW heat exchanger
24
6.20 Valve actuator
24
6.21 Divertor valve assembly
24
6.22 DHW thermistor
24
6.23 Automatic by-pass & DHW non-return valve
24
6.24 Expansion vessel
25
6.25 Condense trap removal
25
6.26 Fan transformer removal
25
6.27 Flue collector removal
25
Checks, adjustments and fault finding
Page
7.1
Checking appliance operation
26
7.2
Appliance mode of operation
26
7.3
Service mode & parameters
27
7.4
Adjusting mode & the gas valve
29
7.5
Combustion analysis test
30
7.6
Checking the expansion vessel
30
7.7
External faults
30
7.8
Electrical checks
30
7.9
Fault finding
30
7.10 Temporary fault codes
31
7.11 Final fault codes
31
Wiring diagrams
Page
8.1
External wiring
32
8.2
Typical control applications
32
8.3
Vokera room thermostat
32
8.4
Other devices
32
Exploded diagrams
Page
9.1
Table 1
35
9.2
Table 2
36
9.3
Table 3
37
9.4
Table 4
38
9.5
Table 5
39
L.P.G. instructions
Page
10.1 Related documents
40
10.2 Technical data
40
10.3 Converting the appliance gas type
40
10.4 Gas supply
40
10.5 Gas supply installation
40
10.6 Adjusting the gas valve
40
Benchmark
41-42
Contents
Design principles & operating sequence
Page
1.1
Principle components
3
1.2
Mode of operation
3
1.3
Mode of operation (Heating)
3
1.4
Mode of operation (DHW)
3
1.5
Safety devices
3
1.6
Optional accessories
3
Technical data
Page
2.1
Central heating
4
2.2
Domestic hot water
4
2.3
Gas pressure
4
2.4
Expansion vessel
4
2.5
Dimensions
4
2.6
Clearances
4
2.7
Connections
4
2.8
Electrical
4
2.9
Flow rates
4
2.9
Flue details (concentric)
4
2.9A Flue details (twin pipes)
4
2.9B Flue details (80/125)
4
2.10 Efficiency
4
2.11 Emissions
5
2.12 Pump duty
5
General requirements (UK)
Page
3.1
Related documents
6
3.2
Location of appliance
6
3.3
Gas supply
6
3.4
Flue system
6
3.5
Air supply
7
3.6
Water circulation
7
3.7
Electrical supply
7
3.8
Showers
7
3.9
Mounting on a combustible surface
7
3.10 Timber framed buildings
7
3.11 Inhibitors
8
General requirements (EIRE)
Page
3A.1 Related documents
9
3A.2 Location of appliance
9
3A.3 Gas supply
9
3A.4 Flue system
9
3A.5 Air supply
9
3A.6 Water circulation
9
3A.7 Electrical supply
10
3A.8 Showers
10
3A.9 Mounting on a combustible surface
10
3A.10 Timber framed buildings
10
3A.11 Inhibitors
10
3A.12 Declaration of conformity
10
Installation
Page
4.1
Delivery
11
4.2
Contents
11
4.3
Unpacking
11
4.4
Preparation for mounting the appliance
11
4.5
Fitting the flue
11
4.6
Connecting the gas & water
16
4.7
Electrical connections
16
Commissioning
Page
5.1
Gas supply installation
18
5.2
The heating system
18
5.3
Initial filling of the system
18
5.4
Initial flushing of the system
18
5.5
Filling the hot water system
18
5.6
Pre-operation checks
18
5.7
Initial lighting
18
5.8
Final flushing of the heating system
18
5.9
Setting the boiler operating temperature
19
5.10 Setting the system design pressure
19
5.11 Regulating the hot water
19
5.12 Final checks
20
5.13 Instructing the user
20
Servicing
Page
6.1
General
21
6.2
Routine annual servicing
21