This appliance must be installed by a competent person in 

accordance with and defined by, the Standard Specification 

(Domestic Gas Installations) Declaration (I.S. 813).

3A.1  RELATED DOCUMENTS

The installation of this boiler must be in accordance with the 

relevant requirements of the local building regulations, the 

current ETCI National Rules for Electrical Installations and the 

bylaws of the local water undertaking.

It should be in accordance also with any relevant requirements 

of the local and/or district authority.

3A.2  LOCATION OF APPLIANCE

The appliance may be installed in any room or internal space, 

although particular attention is drawn to the requirements of 

the current ETCI National Rules for Electrical Installations, and 

I.S. 813, Annex K.

When an appliance is installed in a room or internal space 

containing a bath or shower, the appliance or any control 

pertaining to it must not be within reach of a person using the 

bath or shower.

The location chosen for the appliance must permit the provision 

of a safe and satisfactory flue and termination. The location must 

also permit an adequate air supply for combustion purposes 

and an adequate space for servicing and air circulation around 

the appliance. Where the installation of the appliance will be 

in an unusual location special procedures may be necessary, 

refer to I.S. 813 for detailed guidance on this aspect.

A compartment used to enclose the appliance must be de-

SECTION 3A - GENERAL REQUIREMENTS (EIRE)

3.6.8  FREQUENT FILLING

Frequent  filling  or  venting  of  the  system  may  be  indicative 

of a leak. Care should be taken during the installation of the 

appliance to ensure all aspects of the system are capable of 

withstanding pressures up to at least 3 bar.

3.7  ELECTRICAL SUPPLY

The appliance is supplied for operation on 230V @ 50Hz 

electrical supply; it must be protected with a 3-amp fuse. The 

method of connection to the mains electricity supply must allow 

for complete isolation from the supply. The preferred method 

is by using a double-pole switch with a contact separation of 

at least 3,5mm (3° high-voltage category). The switch must 

only supply the appliance and its corresponding controls, i.e. 

time clock, room thermostat, etc. Alternatively an un-switched 

shuttered socket with a fused 3-pin plug both complying with 

BS 1363 is acceptable.

3.8  MOUNTING ON A COMBUSTIBLE SURFACE

If the appliance is to be fitted on a wall of combustible material,

There is no requirement to protect the wall.

3.9  TIMBER FRAMED BUILDINGS

If the appliance is to be fitted in a timber framed building, it 

should be fitted in accordance with the Institute of Gas Engineers 

publication (IGE/UP/7) ‘Guide for Gas Installations in Timber 

Frame Buildings’. 

3.10 INHIBITORS

Vokèra recommend that an inhibitor - suitable for use with 

aluminium heat exchangers - is used to protect the boiler and 

system from the effects of corrosion and/or electrolytic action. 

The inhibitor must be administered in strict accordance with the 

manufacturers instructions*. *Water treatment of the complete 

heating system - including the boiler - should be carried out in 

accordance with BS 7593 and the Domestic Water Treatment 

Association’s (DWTA) code of practice.

3.11 SHOWERS

If the appliance is intended for use with a shower, the shower 

must be thermostatically controlled and be suitable for use with 

a combination boiler.

flow/return 

pipe

control 

valve

temporary 

connection

control 

valve

supply 

pipe

double 

check valve

Fig. 8

Fig. 9

Make-up vessel 

or tank

Automatic 

air-vent

Non-return

valve

Stopcock

5.0 metres minimum

Heating 

return

signed and constructed specifically for this purpose. An exist-

ing compartment/cupboard may be utilised provided that it is 

modified to suit.

This appliance is not suitable for external installation.

3A.3  GAS SUPPLY

The gas meter – as supplied by the gas supplier – must be 

checked to ensure that it is of adequate size to deal with the 

maximum rated input of all the appliances that it serves. Instal-

lation pipes must be fitted in accordance with I.S. 813.

Pipe work from the meter to the appliance must be of adequate 

size. Pipes of a smaller size than the appliance gas inlet con-

nection must not be used. The installation must be tested for 

tightness in accordance with I.S. 813. 

If the gas supply serves more than one appliance, it must be 

ensured that an adequate supply is maintained to each appli-

ance when they are in use at the same time.

3A.4  FLUE SYSTEM

The terminal should be located where the dispersal of combustion 

products is not impeded and with due regard for the damage 

and discoloration that may occur to building products located 

nearby. The terminal must not be located in a place where it is 

likely to cause a nuisance (see I.S. 813).

In cold and/or humid weather, water vapour will condense 

on leaving the terminal; the effect of such pluming must be 

considered.

If installed less than 2m above a pavement or platform to 

which people have access (including balconies or flat roofs) 

Summary of Contents for Easi-Heat Plus 25C

Page 1: ...D BY USER Vok ra is a licensed member of the Benchmark scheme which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK Easi Heat Plus C High effici...

Page 2: ...WATER CIRCULATION 12 3A 7 ELECTRICAL SUPPLY 12 3A 8 MOUNTING ON A COMBUSTIBLE SURFACE 12 3A 9 TIMBER FRAMED BUILDINGS 12 3A 10 INHIBITORS 12 3A 11 SHOWERS 12 3A 12 DECLARATION OF CONFORMITY 12 SECTIO...

Page 3: ...has been designed to meet and exceed the very latest standards in gas central heating technology and if cared for will give years of reliable use and efficiency Please therefore take some time to rea...

Page 4: ...ounter clockwise to reduce the temperature range 40 C 80 C for standard central heating The automatic temperature control function SARA is factory disabled To enable this function please contact the V...

Page 5: ...ntly hot enough it may be necessary to reduce the flow of water at the hot water outlet tap NOTE If the appliance fails to ignite during the ignition sequence it will enter a lockout condition Should...

Page 6: ...position To select OFF mode move the selector switch in the upper position APPLIANCE STATUS LED AND FAULT CODES Fig 3 4 WHAT IF 5 SETTING THE VOK RA Advice for homeowners Please contact Vok ra Custome...

Page 7: ...tained from Vok ra customer services When the product reaches the end of its life it should not be disposed of as solid urban waste but should be brought to a separated waste collection facility Easi...

Page 8: ...n and the boiler will perform a three minute anti cycle timer delay When the request for heat has been satisfied the appliance pump and fan may continue to operate to dissipate any residual heat withi...

Page 9: ...ght mm 792 Width mm 405 Depth mm 253 Dry weight kg 27 30 2 6 Clearances Easi Heat Plus 25C Easi Heat Plus 29C Sides 12mm Top 150mm from casing or 25mm above flue elbow whichever is applicable Bottom 1...

Page 10: ...rature boilers 37 C and for other heaters 50 C return temperature at heater inlet Seasonal space heating energy efficiency class A Water heating energy efficiency class A Parameter Symbol Value Unit P...

Page 11: ...lcony level 300 mm J From a surface or boundary facing the terminal 600 mm K From a terminal facing a terminal 1200 mm L From an opening in the car port into the building 1200 mm M Vertically from a t...

Page 12: ...c directly from the mains supply must be provided see fig 8 This method of filling complies with the current Water Supply Water Fittings Regulations 1999 and Water Bylaws 2000 Scotland If an alternati...

Page 13: ...s to be fitted on a wall of combustible material There is no requirement to protect the wall 3 9 TIMBER FRAMED BUILDINGS If the appliance is to be fitted in a timber framed building it shouldbefittedi...

Page 14: ...LOW PRESSURE SEALED SYSTEM An alternative method of filling the system would be from an independent make up vessel or tank mounted in a position at least 1 metre above the highest point in the system...

Page 15: ...talsobemadetothemaximumlength see table below when additional bends are used Reduction for additional bends Bend Reduction in maximum flue length for each bend 45 bend 1 0 metre 60 100 1 0 metre 80 12...

Page 16: ...flue length see table below Reduction for bends Bend Reduction in maximum flue length for each bend 45 bend 1 0 metre 60 100 1 0 metre 80 125 90 bend 1 0 metre 60 100 1 0 metre 80 125 Vertical flue te...

Page 17: ...no less than 20mm diameter to the outlet pipe and ensure it discharges in accord ance with building regulations or other rules in force 4 7 ELECTRICAL CONNECTIONS The boiler is supplied with a 2 metre...

Page 18: ...to remove any installation debris from the boiler prior to lighting Refill the boiler and heating system as described in 5 3 5 5 PRE OPERATION CHECKS Before attempting the initial lighting of the appl...

Page 19: ...this appliance including these instructions and explain the importance of keeping them in a safe place Explain to the user how to isolate the appliance from the gas water and electricity supplies and...

Page 20: ...nd remove the pump outlet pipe A from the pump assembly combustion chamber connection Remove the expansion pipe locking pin B from the top of the pump assembly and withdraw the flexible pipe Locate an...

Page 21: ...the reverse order Check and adjust burner pressure settings WARNING A GAS TIGHTNESS CHECK MUST BE CAR RIED OUT 6 13 ELECTRODES fig 27 Carry out component removal procedure as described in 6 4 Remove t...

Page 22: ...e carefully withdraw the by pass cartridge S1 and or DHW non return cartridge T1 Ensure all seals are in good condition taking care to ensure they are replaced correctly Replace in the reverse order e...

Page 23: ...anger DisconnectthewiringtotheDHWflowswitch Slacken and unscrew the inlet connection Unscrew the nut E2 Lift the DHW flow switch housing from its seating If necessary remove the locking pin F2 from th...

Page 24: ...e gas rate to 75 for a period of 15 minutes The speed of the fan and therefore the output of the boiler is determined by the temperature of the water sensed by the flow temperature sensor consequently...

Page 25: ...tion analysis check can easily be carried out on the appliance via the test points located on the top of the applian ce see 7 3 Operate the boiler in combustion analysis mode see 7 3 1 Insert the flue...

Page 26: ...o proceed to next stage If not see 7 7 4 connect test leads between the Neutral Earth connec tions at the appliance terminal strip The meter should read approximately 0 15Vac If so polarity is correct...

Page 27: ...particular control Further guidance on the recom mended practice for the installation of external controls can be found in CHeSS HC5 HC6 www energyefficiency gov uk 8 4 VOK RA LOWER COVER MECHANICAL...

Page 28: ...ic hot water temperature WPS Water pressure switch S E Spark electrode TSC2 Ignition transformer 3W 3 way motor F O H T Flow over heat thermostat FS Flue sensor FT Flow thermistor NTC RS Return thermi...

Page 29: ...37 0 mbar 37 0 mbar Heating maximum gas rate kg hr 1 55 1 94 DHW maximum gas rate kg hr 1 94 2 25 Minimum gas rate kg hr 0 39 0 47 Injector size 3 8 mm 3 9 Silencer flange 27 mm 29 mm CO2 maximum outp...

Page 30: ...TO MINIMUM RATE In accordance with section 7 3 set boiler to operate at minimum rate to minimum load condition Allow sufficient time for combustion to stabilise YES Is CO 350ppm and CO CO2 ratio less...

Page 31: ...ommissioning checklist completed in full To instigate the boiler guarantee the boiler needs to be registered with the manufacturer within one month of the installation To maintain the boiler guarantee...

Page 32: ...terlock Provided ALL SYSTEMS The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer s instructions Yes What system cleaner was used What inhibitor was used Quantity...

Page 33: ...gister No Record At max rate CO ppm AND CO At min rate Where Possible CO ppm AND CO Comments Signature SERVICE 04 Date Engineer name Company name Telephone No Gas safe register No Record At max rate C...

Page 34: ......

Page 35: ......

Page 36: ...1HG enquiries vokera co uk www vokera co uk www vokera ie Sales General Enquires T 0844 391 0999 F 0844 391 0998 Vok ra Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited...

Reviews: