![Vogtlin SmartTrak 100 Series Manual Download Page 30](http://html.mh-extra.com/html/vogtlin/smarttrak-100-series/smarttrak-100-series_manual_1044498030.webp)
30
Air
NOTE:
If gas is flowing the Pilot Module will immediately begin to accuratelydisplay
the gas mass flow rate on the LCD panel. If you have chosen alternate units or another
gas, the display will show the selected units instead of the above.
2.
Open the gas supply:
SmartTrak is now ready to monitor the gas mass flow rate. Let
the instrument warm up for at least 15 minutes for optimal performance.
3.
After 30 minutes, if your zero reading and/or calibration are off (i.
e. show flow at
zero), we recommend that you perform the re-zeroing procedure. Refer to page 45
“Zero Meter Screen” for instructions.
Your SmartTrak instrument is now ready for use!
Pilot Module Operation, Mass Flow Controllers
After your instrument is installed and the system has undergone a complete leak check as
discussed in detail in Chapter 2, follow these steps:
1.
The valve will remain closed until power is supplied.
See Chapter 2 for
wiring instructions.
CAUTION: Remember that the valve in the SmartTrak is not a guaranteed positive
shut-off device. For dangerous applications, Vögtlin recommends use of an external
shut-off safety valve.
When power is applied, the flow control valve will operate per the instructions it receives
from the Pilot Module. When the SmartTrak is delivered, the valve will be in the
Automatic (Normal) state and the Pilot Module will provide the correct zero setpoint
reference. As a result, the valve will be closed. However, the valve will return to the state
it was in the last time the instrument was operated.
WARNING: If you do not know the setpoint or the valve state of the Mass Flow
Controller before it was shut down, you must assume that the valve will open when
power is applied. TAKE NECESSARY PRECAUTIONS.
2.
Power Up Your Instrument:
Apply power to your instrument using Vögtlin’s
power supply or your own input power source. See Chapter 2, Figure 2-5:
Power Supply Requirements. When power is first applied, the Pilot Module
will display:
Version
2.04X
Read Parameters
Summary of Contents for SmartTrak 100 Series
Page 63: ...63 C ADJUSTMENTS Clicking on adjustments brings up the meter settings screen ...
Page 74: ...72 Appendix A C100 M100 SmartTrak Product Specifications Dimensions and Mounting ...
Page 75: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 73 ...
Page 76: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 4 7 ...
Page 77: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 75 ...
Page 78: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 76 ...
Page 79: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 77 ...
Page 80: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 78 ...
Page 82: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 80 ...
Page 83: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 81 ...
Page 85: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 83 ...
Page 86: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 84 ...
Page 87: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 85 ...
Page 89: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 87 ...
Page 90: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 88 ...
Page 91: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 89 ...
Page 92: ...Vögtlin Instruments Instruction Manual SmartTrak 100 Series 90 ...
Page 109: ...Vögtlin Instruction Manual SmartTrak Series 100 107 private static uint CalcCRC byte cmnd ...
Page 111: ...Vögtlin Instruction Manual SmartTrak Series 100 109 Else ...
Page 112: ...Vögtlin Instruction Manual SmartTrak Series 100 110 crcWord crcWord 2 ...