P24AL & P34AL Service Manual
START-UP & OPERATION
12/2016
5-7
4.
Close the cylinder valve immediately when the ammonia feed light comes on and reopen it when
the light goes out. Repeat until properly charged.
! CAUTION !
Do not leave a refrigerant cylinder attached to the machine unattended.
Disconnect it immediately when the machine is charged or the cylinder is empty.
! CAUTION !
Operating Tips.
Make sure the machine is left running in the AUTO position. This will assure a complete
shutdown if a safety or overload is tripped.
To initiate a harvest cycle, simply push the MANUAL HARVEST push button (3PB).
To interrupt the harvest cycle (harvest timer #2TR) and revert to a freeze cycle, turn the
HAND/AUTO switch to HAND and back to AUTO.
The circulating water overflow tubing will show that water is being slightly lifted up the tubing
near the end of the freezing cycle. If this action ceases and water begins overflowing from the
top water box, it is an indication that the tubes are freezing solid and the machine should begin a
harvest cycle. It is best not to freeze the ice solid with no hole.
To cease ice production manually, allow the machine to complete the harvest period and start the
freeze period. When the LIQUID FEED light comes on at the beginning of the freeze period,
push the STOP button to cease ice production.
Thaw Gas Regulating and Suction Regulating Valve Adjustment.
The following is the
procedure for regulating valve adjustment. On dedicated compressor systems the suction regulating
valve is not required. However, the compressor must unload by 50% or greater during the harvest or
a hot gas bypass must be installed.
1.
Install gauge and gauge valve in gauge port of regulator.
2.
Turn high pressure stem (down stream pressure) on suction regulator into the milled flats, do
not turn milled flats into packing nut.
3.
Start the machine and initiate a harvest.
4.
Adjust the thaw gas regulator to build pressure to 60 - 65 psig. (1 turn is approximately 13 psig)
5.
Adjust (downstream) high-pressure stem on suction regulator to begin regulating at 59-64 psig.
(Slightly below the thaw gas regulator)
6.
After the machine has completed the harvest cycle and returned to the freeze cycle, adjust the
low pressure (upstream pressure) on the suction regulator to maintain the required freezer
pressure. For clear ice a minimum of 20-psig freezer pressure is required.
Summary of Contents for P-24AL
Page 1: ...12 2016 P 24AL P 34AL TUBE ICE MACHINE Service Manual 5000 ...
Page 10: ...P24AL P34AL Service Manual TABLE OF CONTENTS 12 2016 vi ...
Page 15: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 5 Figure 1 2 P24AL Right Side ...
Page 16: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 6 Figure 1 3 P24AL Back Side ...
Page 17: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 7 Figure 1 4 P24AL Left Side ...
Page 18: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 8 Figure 1 5 P34AL Front Side Control Panel ...
Page 19: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 9 Figure 1 6 P34AL Right Side ...
Page 20: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 10 Figure 1 7 P34AL Back Side ...
Page 21: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 11 Figure 1 8 P34AL Left Side ...
Page 22: ...P24AL P34AL Service Manual INTRODUCTION 12 2016 1 12 ...
Page 62: ...P24AL P34AL Service Manual START UP OPERATION 12 2016 5 8 ...
Page 84: ...P24A P34A Service Manual TROUBLESHOOTING 12 2016 8 12 ...
Page 110: ...P24AL P34AL Service Manual SERVICING OPERATIONS 12 2016 9 26 ...
Page 126: ...P24AL P34AL Service Manual TABLES CHARTS 12 16 16 11 8 ...
Page 130: ...P24AL P34AL Service Manual INDEX 12 2016 12 4 ...
Page 131: ...Appendix A ...
Page 134: ......
Page 136: ...i ...
Page 137: ...ii ...
Page 138: ...1 ...
Page 139: ...2 ...
Page 140: ...3 ...
Page 141: ...4 ...
Page 142: ...5 ...
Page 143: ...6 ...
Page 144: ...7 ...
Page 145: ...8 ...
Page 146: ...9 ...
Page 147: ...10 ...
Page 148: ...11 ...