Forklift-&-Rope or Lifting Straps Method
You need: +
extra headroom
+
Forklift with adequate load and height capacities
+
1/2” rope or four lifting straps to bind forks to top angles
Step 1.
Remove front, rear, and top access panels.
Step 2.
Position fork truck so that forks are resting flat on top angles of Tube-Ice
®
machine.
Step 3.
Use the rope or straps to securely bind forks to the top angles.
! CAUTION !
Be sure the bin is level and is set in its proper location.
See the space diagram, FIGURE 6.
! CAUTION !
Step 4.
Lift Tube-Ice
®
machine and set into drip pan of bin.
Step 5.
Remove rope or straps and fork truck.
Step 6.
Check alignment of ice chute to bin opening.
Summary of Contents for HE S Series
Page 2: ...Installation Start up HES Series 2 Blank Page ...
Page 12: ...Installation Start up HES Series 12 FIGURE 8 Typical Space Diagram ...
Page 26: ...Installation Start up HES Series 26 FIGURE 16 Piping Schematic Air Cooled ...
Page 27: ...Installation Start up HES Series 27 FIGURE 17 Piping Schematic Water Cooled ...