INSTALLATION
THROUGH THE ROOF/CEILING
INSTALLATION
• When venting the heater through the ceiling, the pipe
is connected the same as through the wall, except the
clean-out tee is always on the inside of the house, and
a 3” (76 mm) adapter is added before the clean-out tee.
•
You must use the proper ceiling support flanges and
roof flashing (supplied by the pipe manufacturer; follow
the pipe manufacturer’s directions). It is important to
note that if your vertical run of pipe is more than 12ft
(3.7m), the pellet vent pipe size should be increased to
4” (102 mm) in diameter.
•
Do not exceed more than 4ft (1.22m) of pipe on a
horizontal run and use as few elbows as possible. If an
offset is required, it is better to install 45-degree elbows
rather than 90-degree elbows.Venting your pellet stove
into an existing Class A 6” chimney System
1.
IMPORTANT:
If you are installing your pellet stove as a replacement
to an existing wood stove, you can install your pellet
stove using the existing class A 6” venting system.
You must have the existing chimney system
cleanedand/ or inspected by a qualified chimney
sweep before proceeding with the installation of your
pellet stove.
2. To the right is an example of an installation using part
number 860001, 3-6” transition into 6” connector pipe.
the illustration is only an example. Please conform
to any local building codes or regulations having
jurisdiction before you have a qualified installer
proceed with this installation.