Service manual
20
8.8 Evacuation
Procedure:
1. Connect the vacuum pump to the charge set’s centre hose.
2. Evacuation for approximately one hour.
Confirm that the gauge needle has moved toward -0.1 Mpa (-76 cmHg) [vacuum of 4 mmHg or less].
3. Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the
gauge needle does not move (approximately 5 minutes after turning off the vacuum pump).
4. Disconnect the charge hose from the vacuum pump.
Vacuum pump oil, if the vacuum pump oil becomes dirty or depleted, replenish as needle.
Summary of Contents for ACP-24CH70AEB
Page 1: ...ACP 24CH70AEB RoHS Service manual ENG ...
Page 2: ......
Page 5: ......
Page 14: ...Service manual 9 5 Refrigerant cycle diagram Cooling only Heat pump mode ...
Page 18: ...Service manual 13 7 2 Wiring diagram MSE 21CRN2 MSE 24CRN2 MSE 28CRN2 ...
Page 19: ...Service manual 14 MSE 21HRN2 ACP 24CH70AEB MSE 28HRN2 ...
Page 48: ......
Page 49: ......
Page 50: ......