Service manual
18
8.6
Re-air purging (Re-installation)
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the closed position.
2. Connect the charge set and a charging cylinder to the service port of the 3-way valve.
Leave the valve on the charging cylinder closed.
3. Air purging.
Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on
the 2-way valve approximately 45’ for 3 seconds then closing it for 1 minutes; repeat 3 times.
After purging the air, use a torque wrench to tighten the flare nut to on the 2-way valve.
4. Check the gas leakage.
Check the flare connections for gas leakage.
5. Discharge the refrigerant.
Close the valve on the charging cylinder and discharge the refrigerant until the gauge indicate 0.3 to 0.5
Mpa.
6. Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to the
open position.
Be sure to use a hexagonal wrench to operate the valve stems.
7. Mount the valve stems nuts and the service port cap.
Be sure to use a torque wrench to tighten the service port cap to a torque 18N.m.
Be sure to check the gas leakage.
Summary of Contents for ACP-24CH70AEB
Page 1: ...ACP 24CH70AEB RoHS Service manual ENG ...
Page 2: ......
Page 5: ......
Page 14: ...Service manual 9 5 Refrigerant cycle diagram Cooling only Heat pump mode ...
Page 18: ...Service manual 13 7 2 Wiring diagram MSE 21CRN2 MSE 24CRN2 MSE 28CRN2 ...
Page 19: ...Service manual 14 MSE 21HRN2 ACP 24CH70AEB MSE 28HRN2 ...
Page 48: ......
Page 49: ......
Page 50: ......