Chapter 6. Installation and check, maintenance,cleaning
6.1 Installation
1) Temperatures to install : 5~40 , to store:-25~80
Humidity : 50~80%
2) Please be sure to avoid open place to sun light or in the place of high
temperatures or humidity.
3) Please do not install or store in the palce near chemical materials or explosive
materials.
4) Please do not install or store in the place near hot air baloon.
5) Please do not install or store in the place near water and do not handle
with wet hands.
6) Please do not install or store in the place near with excessive shock or vibration.
7) Please do not install or store in the place with excessive dusts.
8) Please keep the distance more than 10Cm from wall not to shield the fan of
rear side of the equipment.
9) Please be sure to place the equipment on the table which may be able
to sustain the equipments' weight(40kg)
10) Please be sure to other materials like metals are not be gotten in the
equipment inside.
600
600
600
600
65
65
65
65
220
220
220
220
520
520
520
520
Ø
Ø
Ø
Ø80
80
80
80
Ø
Ø
Ø
Ø100
100
100
100
Water
Water
Water
Water
Water Drain
Water Drain
Water Drain
Water Drain
170
170
170
170