11
Place the eyebolts in the same height and symmetrically around the
intended rail position
–
this is to avoid screwing the rail.
15.
Prepare the lengths of suitable lengths of wire: The wires should be long
enough to reach from the eyebolts in the ceiling to the eyebolt on the rail
connectors.
Attach the supplied push-through wire hooks to one end off all wire ends
Then attach the upper hooks of all wires to the eyebolts in the building
structure
–
the other end hanging loosely down.
The attach the other end of all wire ends hanging from the ceiling
to the lower hooks.
Important: Every other wire pair is crossed to
prevent movement sideways. Illustration: All blue wires are crossed:
16.
It is time to lift the rail to the desired position
–
minimum 2.3 m over floor
level (for standard LabSpion goniometer med 1.5 m standard tower). For
LabSpions with 2.0 m tower, the minimum height is 2.55 m over floor level.
17.
A small group of people is needed, and each person needs a ladder. The
group simultaneously lifts the rail approximately the desired height while
securing the steel wires with the push-though hook to the eye bolts on the
rail connectors. Then, adjust every wire set to make sure that the whole
rail in the desired height and perfectly levelled.
Push-through wire hook
Push here
to loosen